This checklist covers projects that already have drawings. If you only have samples or photographs, start with our guide to quoting without drawings. Dongying works on precision tooling, injection molding and insert-molding projects in Suzhou. The requirements below are inputs for project review; the resulting quotation defines the agreed scope.
Put a file register at the front of the RFQ
A folder containing several files named "final" leaves the supplier to choose a revision. Include a short register showing the part identifier, document type, revision and quotation status. Keep obsolete files outside the active package, or mark them clearly as reference only.
| Input | What to identify |
|---|---|
| 3D model, such as STEP | Part identifier, revision, units and whether geometry is released or provisional |
| 2D PDF drawing | Matching revision, dimensions, datums, notes and appearance requirements |
| Material specification | Exact grade if selected, color and any proposed alternatives |
| Assembly or insert documents | Mating interfaces, separate component revisions and supply responsibilities |
| Project brief | Requested deliverables, quantities, approval requirements and target dates |
If the drawing and model disagree, identify the affected feature and ask engineering to resolve it. State which document controls each requirement. A newer file date alone does not establish design authority. Our drawings and revisions guide covers this alignment.
Explain which features matter in use
Mark the dimensions and interfaces that affect assembly or function. Include the mating-part definition where it explains a fit, and distinguish visible surfaces from internal faces. Identify areas where gate marks, ejector marks or a parting line would interfere with appearance, sealing or assembly.
A note saying "all dimensions critical" does not explain the inspection priorities. Show the relevant datums and how the part is located during measurement. If acceptance depends on an assembled condition, describe that condition rather than expecting the supplier to infer it from the individual part model.
Name the resin grade and separate the quantities
"Nylon" or "engineering plastic" leaves material selection open. If engineering has selected a grade, include its manufacturer designation, filler content, color and available datasheet. Mark alternatives as proposals requiring approval. If selection remains open, provide the operating environment and the requirements the grade must meet.
For glass-filled materials, identify the specified compound rather than treating different grades as interchangeable. This checklist does not select a tool steel, establish a mold life or promise suitability for a particular application. Those decisions require the material and part to be reviewed together.
Separate sample quantity, expected order quantity and forecast annual demand. Mark the forecast as a planning input and explain any ramp-up or uncertain demand. It is not a purchase commitment. If you request alternative cavity arrangements, ask for their assumptions and commercial scope to be stated separately. Annual demand alone does not settle the mold configuration.
Define inserts and the delivery boundary
For insert molding, provide both the plastic-part definition and the insert drawing. Identify insert material, surface condition, revision and locating features. State any retention, sealing or electrical checks that the finished assembly must undergo.
Assign an owner to each supply step: insert manufacture, surface treatment, incoming checks, molding, subsequent assembly and final acceptance. A request for a molded assembly does not automatically assign every metal-processing operation to the molder. Our insert-molding input guide explains these boundaries; the busbar RFQ guide adds conductor-specific considerations.
Also state whether the quotation covers tooling, molded components or both. For a mold intended to run elsewhere, include the receiving site's available machine and interface specifications. Identify the delivery destination and requested handover documents. Discuss ownership, maintenance and transfer terms in the project agreement rather than assuming they follow automatically from a tooling payment.
Include acceptance documents and a review sequence
List the reports needed for sample approval and production release. If your project requests PPAP, first article inspection or material documentation, specify the required content and format. These are requests for scope review, not documents to assume are included with every order. Define the measurement method, sample identification and acceptance criteria alongside the drawing revision.
A useful RFQ review sequence is:
- Confirm the deliverables, document register and rights to share the files.
- Resolve revision conflicts and list missing inputs with a responsible owner.
- Review geometry, resin, inserts, tooling options and inspection requirements together.
- Record proposed changes and assumptions for customer engineering to approve.
- Compare quotations against the same scope, separating tooling, components and any additional work.
If a requirement remains open, ask the supplier to identify the assumption behind its price. Do not read a preliminary quotation as authorization to manufacture. Link later approvals and changes back to the quoted revision. See inspection and approval for the connection between requirements, samples and records.
Include your requested quotation date and explain the purchasing decision it supports. Ask the supplier to confirm whether the package is sufficient and what remains unresolved. A requested deadline is an input for discussion, not a guaranteed response or tooling schedule.
FAQ
Do I need both a 3D model and a 2D drawing?
Send both when available. The model communicates geometry, while the drawing can identify dimensions, datums, finishes and acceptance notes. Check their revisions and resolve discrepancies before treating the package as an agreed quotation basis.
What if the drawing and STEP file have different revisions?
Identify the mismatch and ask the design owner to confirm the intended definition. State which document controls the affected requirements. If pricing proceeds provisionally, record the assumption and request a review when the aligned files are available.
Should I specify a mold steel and cavity count?
Include them if they are customer requirements. Otherwise, provide the resin grade, part requirements and separate quantity assumptions, then request a tooling proposal. A proposed steel or cavity arrangement needs review before it becomes an agreed specification.
Can I request PPAP, FAI and material records in the RFQ?
Yes. Identify the documents, required content, format and approval criteria at the inquiry stage. Ask the supplier to confirm the deliverables and any separate scope or cost. Listing a document in the RFQ does not establish that it is included.
How should I send confidential drawings to Dongying?
Discuss confidentiality arrangements and a suitable transfer method before sharing sensitive files. Send only information you are entitled to share. You can start through the contact page without attaching drawings; confirm the file-transfer route separately.
Prepare your inquiry
Use the project contact page to introduce the part, supply scope and available documents. It is a starting point for the discussion; agree how drawings will be transferred before sending sensitive files. Keep the file register with subsequent revisions so each quotation and approval can be traced to the same requirements.